Fu10 Day Watching 18 Install 【2027】

Set gain to 0-6dB (no higher, or noise appears). Iris should be manual: F5.6 to F8.0 for deep depth of field.

Run a shielded Cat6 cable (max 100m) for power over Ethernet (PoE) plus a separate BNC for analog fallback. Avoid running parallel to AC power lines. Phase 2: Power-On & Network (Steps 5-8) Step 5: Initial Boot Connect power. The FU10 will take ~45 seconds to initialize. Watch for the green LED (steady = good; flashing = SD card error). fu10 day watching 18 install

Via the on-screen display (OSD), set a static IP (e.g., 192.168.1.100). Disable DHCP to prevent address changes mid-installation. Set gain to 0-6dB (no higher, or noise appears)